FH ELECTRICIAN SERVICE PTY LTD
Quotation terms
报价条款
Commercial and residential customers · English / 中文
Current template snapshot: 18 October 2026 / 当前模板整理日期:2026年10月18日
Special reminder — ASP2 customer obligations
特别提醒:ASP2 客户义务与资料要求
For ASP Level 2 work / 适用于 ASP2 工程
- Provide a complete electricity bill (all pages). If no bill is available, provide the account-opening authorisation/reference number, the electricity retailer used to open the account, and the NMI number.请提供完整电费单(所有页面)。如没有电费单,请提供开户许可号码、开户的能源公司名称,以及 NMI 号码。
- Provide the electricity account holder’s full name, contact telephone number and email address.请提供电费账单所有人/开户人的完整姓名、联系电话和 Email 地址。
- For AGL customers, also provide the account holder’s driver licence number and the name under which the account was opened.AGL 客户还须提供账单所有人/开户人的驾照号码及开户人姓名。
- For company customers, provide the full company name, a complete electricity bill, and the contact person’s telephone number and email address.公司客户须提供完整公司名称、完整电费单,以及联系人的电话和 Email 地址。
Temporary switchboard use and free hire terms
临时电箱使用及免费租用条款
Version 1.1 · Published 18 October 2026 / 2026年10月18日
Standalone public terms / 独立公开条款链接
1. Owner (Party A) and Contractor (Party B)
业主(甲方)与承包商(乙方)
Contracting parties: The Owner identified as a contracting party in the quotation is Party A. The Contractor named in the quotation is Party B. An authorised representative may sign on behalf of Party A but is not deemed to be the Owner. If the contracting client is a tenant, builder or another entity rather than the Owner, the quotation must identify that capacity and any required owner authority; this clause does not bind a property owner who is not a party to the contract.
合同双方:报价中明确列为合同一方的业主(所有者)为甲方,报价中列明的承包商为乙方。经授权的代表可代甲方签署,但不因代签而被认定为业主。如签约客户是租户、建筑商或其它主体而非业主,报价须明确其身份及所需业主授权;本条不使未作为合同一方的物业所有者承担合同义务。
2. Price adjustment due to market cost increases
市场成本上涨引起的价格调整
Market cost increases: If market fluctuations result in increased costs of materials, labour or equipment during a prolonged period between quotation and completion of the works, the Contractor (Party B) may propose a corresponding price adjustment to the Owner (Party A). Any proposed adjustment must be notified to Party A in writing, together with the reasons for and amount of the adjustment, and agreed by both parties in writing before it takes effect. Any required variation must be signed by both parties. No price increase is applied automatically. Mandatory statutory cancellation, termination and refund rights remain unaffected.
市场成本上涨:如从报价至工程完成期间周期较长,市场波动导致材料、人工或设备成本上涨,承包商(乙方)可向业主(甲方)提出相应价格调整。调整前须书面通知甲方,说明调整原因及金额,并经双方书面同意后生效;依法或依约需签署的变更须由双方签署。不自动加价。不可排除的法定权利的取消、终止和退款权利不受影响。
3. 12 months of free hire from installation
自安装日起免费租用12个月
Where FH supplies a temporary switchboard and temporary supply system on hire, the free hire period is 12 months from the installation date recorded for the site. The equipment supplied on hire remains FH’s property. Free hire refers to use of the hired equipment; installation, electricity usage, retailer/network charges and other work are governed by the agreed quotation and are not made free by this clause.
FH以租用方式提供的临时开关箱及临时供电系统,自现场记录的安装之日起免费租用12个月。租用设备的所有权仍属FH。免费租用指租用设备的使用;安装、电费、能源零售商/电网费用及其它工程按双方同意的报价执行,本条不代表这些项目免费。
4. Owner-builder or builder must sign
Owner-builder 或 Builder 须签署同意
On receiving FH’s quotation/contract, the owner-builder or builder responsible for the site must review and sign acceptance of these temporary switchboard use terms as part of the quotation/contract. For new arrangements, signed acceptance is required before the hire is provided. Silence or failure to sign is not acceptance of a contract.
负责现场的Owner-builder(自建业主)或Builder(建筑商),在收到FH报价合同后,须阅读并签署同意作为报价合同组成部分的本临时电箱使用条款。新租用安排须先取得签署同意,再提供租用服务。沉默或未签字不视为接受合同。
5. No automatic renewal after 12 months
12个月期满不自动续租
To continue using the equipment after the 12-month period, the owner-builder or builder must obtain FH’s written agreement and sign the applicable continued-hire terms before expiry. Any further hire period and charges must be agreed in writing. If the required continued-hire agreement has not been signed by expiry, this is treated as an election not to continue the hire at expiry; there is no automatic renewal or automatic acceptance of further hire charges.
如需在12个月免费租用期满后继续使用,Owner-builder或Builder须在到期前取得FH书面同意,并签署适用的继续租用条款。后续租期及费用须书面约定。到期仍未签署所需继续租用协议,视为选择到期不再续租;不自动续租,也不自动视为同意后续租金。
6. FH may recover its temporary equipment at expiry
期满后FH有权拆除并收回临时设备
If the hire expires without a signed continued-hire agreement, FH may arrange disconnection, dismantling and recovery of its hired temporary switchboard and associated temporary supply system. FH will give reasonable advance written notice and coordinate safe isolation, the access appointment and any required retailer/network approvals. Recovery must use lawful site access and appropriately licensed/accredited personnel. This clause does not permit entry without lawful authority or removal of customer-owned permanent equipment. The owner-builder or builder must cooperate with the agreed access and arrange any replacement supply needed after expiry.
如租期届满且未签署继续租用协议,FH有权安排断开、拆除并收回其出租的临时开关箱及相关临时供电系统。FH会提前给予合理书面通知,协调安全断电、进场时间及必要的能源零售商/电网审批。收回设备须依法进场,并由具备相应执照/资质的人员实施。本条不授权未经合法许可进入现场或拆除客户所有的永久设备。Owner-builder或Builder须配合约定进场,并安排期满后仍需使用的替代电源。
7. Application to the agreed contract
以双方同意的合同为准
These terms apply when supplied with and accepted as part of the relevant quotation/contract. Publishing or updating this page does not retrospectively change an existing signed agreement. Mandatory consumer and statutory rights remain unaffected.
本条款随相关报价合同提供并获接受后,作为该合同的一部分适用。网站公布或更新本条款,不追溯更改已签署协议。不可排除的消费者及法定权利不受影响。
Safety duties and legal rights安全责任与法定条款解读
This guide explains the distinction between legal duties, agreed work scope and FH voluntary promises. It does not replace the agreed quotation, required statutory notices or applicable law. Technical verification depends on the actual installation and applicable standards.
本解读区分法定义务、约定工作范围及FH自愿承诺,不代替具体报价、必须提供的法定告知或适用法律。技术检查范围须结合实际系统及适用标准判断。
Work within one week / 一周内加急工程 · Warranty categories / 保修分类
Licensed work and safe methods / 持证施工与安全作业
Mandatory safety duty / 强制安全义务
FH must use appropriately licensed or supervised personnel, assess work risks and use lawful isolation, testing and safe work methods. Customer instructions or a signed waiver do not authorise unsafe work. Energised work is subject to strict legal exceptions, not ordinary customer consent.
A small job still requires safe, compliant work.
FH须安排适当持证或受监督的人员,评估施工风险,依法采取隔离、验电及安全作业措施。客户指示或签署免责书不构成不安全施工的许可。带电作业须符合严格法定例外,不能仅凭客户同意。
工程小不等于可以省略安全合规责任。
Verification, testing and CCEW / 检查、测试与CCEW
Mandatory; extent depends on the work / 强制义务;具体范围按实际工作确定
Required verification and certification concern the work carried out. Checks may need to include existing circuits or interfaces affected by that work. The exact extent follows applicable standards and site conditions; the price scope cannot remove required safety tests. A CCEW must accurately describe the certified work and is not an unlimited whole-house warranty.
List the work, required test results and any limitations accurately. Do not certify unverified work.
须按实际施工履行必要检查、测试及认证;检查可能涉及受本次工作影响的原有回路或连接部位。具体范围按适用标准及现场情况确定,不能用报价排除必要安全测试。CCEW须准确描述认证工作,不是整屋无限保修承诺。
准确记录施工、必要测试结果及限制,不对未经核实的工作作出认证。
Existing wiring and appliances / 原有线路与电器
Scope boundary; cause must be assessed / 合同范围边界;须判断原因
A switchboard upgrade does not by itself renew all existing wiring or appliances or provide FH voluntary cover for unrelated deterioration. FH remains responsible for defective work it performs, required checks and damage it causes. A later fault must be assessed by its cause rather than automatically assigned to either party.
Record the existing condition and the agreed boundary; do not promise that every hidden defect has been found.
电箱升级本身不等于更新全部旧线路或旧电器,也不对无关老化提供FH自愿保修。FH仍对本次缺陷施工、必要检查及施工造成的损坏负责。后续故障须查明原因,不能自动全部归FH或客户承担。
记录原有状况及约定范围,不承诺已发现所有隐蔽缺陷。
Hazards found and refusal of repairs / 发现危险与客户拒修
Safety action and paid rectification are separate / 安全处置与付费整改分开
When a hazard is identified, FH must assess it and take required safety measures, which may include stopping work or isolating unsafe equipment. Explain and record the hazard and proposed rectification. Customer refusal does not permit unsafe reconnection and does not automatically require FH to replace the whole installation for free.
Arrange a safe interim condition and a separately agreed repair scope where needed.
发现隐患后,FH须评估并采取必要安全措施,可能包括停工或隔离不安全设备;说明并记录隐患及整改建议。客户拒修不能作为危险重新送电的许可,也不自动意味着FH须免费更换整套系统。
按需要安排安全临时状态及另行同意的整改范围。
Official references / 官方依据: [1]
Extra work and emergency measures / 额外工程与紧急措施
Price agreement; safety duties remain / 费用约定;保留安全义务
Unrelated rewiring, appliance repairs, hazardous-material remediation and other unquoted work are not automatically included. Agree scope, price and schedule before additional repairs. Necessary immediate safety measures are distinct from authority for unrestricted permanent repairs or unlimited charges; explain and document any such action and its cost basis.
A variation is not a waiver of compulsory safety duties or existing refund rights.
无关的重新布线、电器维修、有害材料处理及其它未报价工作不自动包含。额外维修先确认范围、价格和工期。必要即时安全措施不等于获得任意永久维修或无限收费授权,须解释并记录措施及费用依据。
变更工程不能免除强制安全义务或已有退款权利。
Customer and site cooperation / 客户与现场配合
Cooperation; legal duties are not transferred / 配合义务;不转移法定责任
Customers are asked to provide agreed access, disclose known hazards and restrictions and cooperate with planned shutdowns. At workplaces, businesses sharing control must consult, cooperate and coordinate as required. These arrangements do not transfer FH duties or make the customer responsible for every undiscovered defect.
Allocate practical tasks clearly while each duty holder retains its own duties.
客户应提供约定进场条件,披露已知危险与限制,并配合计划停电。在工作场所,共同控制现场的企业须按要求协商、合作和协调。这些安排不转移FH义务,也不把所有未发现缺陷都归客户负责。
明确实际任务分工,各责任主体仍履行自身义务。
Official references / 官方依据: [1]
Workmanship, products and resulting damage / 施工、产品及造成的损失
Statutory remedies and causal assessment / 法定救济与因果判断
FH must provide services with due care and skill and meet applicable consumer guarantees. If its failure causes loss, available remedies may extend beyond repairing the original item. Manufacturer warranties are additional; directing the customer to a manufacturer does not remove FH obligations as supplier. A fault outside the work is not automatically an FH-caused loss.
Investigate cause, work records and the applicable remedy; avoid blanket exclusions of all loss.
FH须以应有谨慎和技能提供服务并遵守适用消费者保障。若FH未履行义务造成损失,适用救济可能不限于修复原项目。厂家保修属于额外保障,不能仅让客户找厂家就免除FH作为供应方的义务。范围外故障不自动等于FH造成的损失。
结合原因、施工记录及适用救济判断,不一概排除全部损失。
Voluntary periods and statutory periods / 自愿保修期与法定期限
Separate legal bases / 不同法律依据
FH states 12 months voluntary workmanship cover for ordinary electrical work and five years for solar and battery workmanship, with separately stated supplier system cover. Applicable NSW residential statutory warranties generally distinguish major defects (six years) from other breaches (two years). The legal major-defect test is not determined simply by job price or size. These rights relate to the relevant work and are not automatic cover for every existing item.
Do not describe the voluntary expiry date as the end of every legal claim.
FH日常电工施工自愿保修12个月,太阳能及电池施工五年,供应方系统保修另列。适用NSW住宅法定保修时,一般区分重大缺陷六年和其它违约两年。“重大缺陷”须按法定标准判断,不能只按工程大小或价格决定。这些权利针对相关工作,不自动承保所有原有设施。
不能把自愿保修到期写成全部法律索赔权终止。
Misuse, external events and RCBO trips / 误用、外部事件与RCBO跳闸
Causal exclusion from voluntary cover / 按原因排除自愿保修
Misuse or external events may exclude the damage they actually cause from voluntary cover. An RCBO trip alone does not establish misuse or an FH defect. Repeated resetting is not proof of customer-caused damage without a causal assessment. Do not keep resetting a circuit that continues to trip; seek qualified fault investigation.
Exclusions do not excuse FH defective work or remove mandatory remedies.
误用或外部事件实际造成的损坏,可在该因果范围内排除自愿保修。RCBO跳闸本身既不能证明误用,也不能证明FH施工缺陷;反复合闸仍须判断是否造成相关损坏。对持续跳闸的回路不要反复合闸,应安排合资格人员排查。
排除条款不免除FH缺陷施工责任或强制救济。
Commercial labels, residential rules and ACL / 商业名称、住宅规则与消费者法
Application depends on the transaction / 按实际交易判断适用
An ABN or a commercial quotation label does not by itself remove applicable residential protections. Business purchases may also qualify for Australian Consumer Law guarantees. Check the actual work, contracting parties and applicable criteria; residential-building law, workplace safety law and consumer law have different tests.
Do not reclassify residential work merely to avoid a deposit limit or other protection.
有ABN或报价标为商业,并不自行排除适用住宅保护。企业采购也可能享有澳大利亚消费者法保障。须核对实际工作、签约方及适用条件;住宅建筑法、工作场所安全法与消费者法的判断标准不同。
不得只为规避订金限制或其它保护而把住宅工程改名商业工程。
Deposits, cooling-off and cancellation / 订金、冷静期与取消
Conditional mandatory protections / 按条件适用的强制保护
Written agreement on a deposit does not override an applicable statutory cap or payment restriction. Customer-initiated enquiries, unsolicited sales and qualifying NSW residential contracts have different cooling-off rules. Signing or ordering equipment does not automatically extinguish a protected cancellation right. Outside protected rights, cancellation costs must follow the agreed contract and law, not blanket forfeiture.
Read the applicable deposit and cancellation clauses together; safety duties continue during any shutdown or termination.
双方书面同意订金,不能推翻适用法定上限或付款限制。客户主动询价、非邀约销售及符合条件的NSW住宅合同,其冷静期规则不同。签字或采购设备不自动取消受保护的取消权。保护范围以外的取消费用仍须符合合同及法律,不能一律没收。
结合适用订金和取消条款判断;停工或终止时仍须履行安全义务。
Old switchboard materials and exclusions / 旧电箱材料与排除项目
Hazard control remains mandatory / 危险控制义务仍须履行
Old mounting boards may contain asbestos. Excluding asbestos removal from the quoted price does not authorise disturbing suspect material unsafely. Assess the material and arrange appropriate controls and qualified assistance where required. Quote exclusions distinguish the paid scope from hazard controls; they do not establish that the site is hazard-free.
Document material concerns and any separately agreed specialist work.
旧安装板可能含石棉。报价不含石棉清除,不代表可以不安全地扰动疑似材料。须评估材料并按要求采取控制措施、安排适当合资格协助。报价排除区分付费范围,不免除危险控制义务,也不证明现场不存在危险。
记录材料风险及另行约定的专业工作。
Customer-requested work within one week / 客户要求一周内施工
Expedited scheduling; transaction-specific legal rules / 加急排期;法律条件须按交易判断
Record whether the customer requested commencement or completion within seven calendar days, the contact origin, contract value, requested dates and authorised purchases. A genuine commercial customer-initiated job may agree a lawful 30% deposit; residential deposit limits still apply where relevant. An ordinary small residential job does not automatically have an unsolicited-sale cooling-off period, but its deposit cap and other rights may still apply. Qualifying residential large-contract cooling-off rules and unsolicited-sale rules are distinct. Customer urgency alone waives neither. Before cancellation settlement, identify the applicable right: statutory settlement rules take priority over ordinary cancellation costs. After compliant completion, mere change of mind does not itself extinguish the agreed debt; defects and other protected remedies remain. For applicable NSW residential cooling-off rescission, reasonable out-of-pocket expenses and a reasonable price for work performed may be recoverable under the statute, without double counting. This is different from the unsolicited-sales cancellation regime.
A three-day job is an example of this category, not a statutory emergency exemption. A customer signature is not a substitute for legally required cooling-off waiver formalities.
记录客户要求的是七个自然日内开工还是完工,以及联系来源、合同金额、要求日期和采购授权。真实商业且客户主动联系的工程,可约定合法30%订金;适用住宅订金限制时仍须遵守。普通住宅小工程不自动有非邀约销售冷静期,但仍可能受订金上限及其它保障约束。符合条件的住宅大合同冷静期与非邀约销售规则不同,客户催工本身均不构成放弃。取消结算前先判断适用权利:法定结算规则优先于普通取消成本条款。合规完工后,单纯改变主意本身不消灭约定债务,缺陷及其它受保护救济仍保留。 适用NSW住宅冷静期解除时,可按法律结算合理实际支出及已施工工作的合理价款,不重复计算;这与非邀约销售取消制度不同。
三天内完工属于此排期分类,不自动成为法定紧急例外。客户签字不能代替依法放弃或缩短冷静期所需手续。
Warranty categories保修分类
FH voluntary cover, manufacturer warranties and statutory rights are separate. / FH自愿保修、厂家保修与法定权利分别说明。
FH ordinary electrical work / FH日常电工小工程
12 months from completion / 自完工日起12个月
Voluntary cover for defects attributable to FH workmanship in standalone switchboard upgrades, minor repairs, small additions and socket or light installations. Coverage concerns the work FH performed, not every later fault in existing wiring or appliances. A switchboard upgrade does not warrant the whole existing installation. Unrelated ageing or faults in existing wiring or appliances outside the agreed work are excluded from FH voluntary cover. FH remains responsible for defective work and damage it causes.
针对FH独立电箱升级、小范围维修、小范围加装,以及插座或灯具安装的施工缺陷。保障对应FH实际施工,不是所有后来发生的原有线路或电器故障。 电箱升级不代表对整套原有系统提供保修。约定工作范围以外的旧线路或旧电器,与FH工作无关的老化或故障不在FH自愿保修范围;FH仍对自身施工缺陷及造成的损坏负责。
FH solar and battery workmanship and supplier system warranty / FH太阳能/电池施工及供应商系统保修
5 years from completion / 自完工日起5年
FH provides the separately stated five-year workmanship and supplier system warranty. System operation and performance are assessed against agreed specifications and operating conditions; fixed electricity bills or daily yields are not guaranteed. See S-04 and S-10.
FH提供另行列明的五年施工及供应商系统保修。系统运行与性能按约定规格及运行条件评估,不保证固定电费或每日固定发电量。详见S-04及S-10。
Product manufacturer warranties / 产品厂家保修
As stated for the product and model / 按具体产品及型号列明的期限
The manufacturer warranty period and conditions depend on the supplied product, model and warranty document. These are separate from FH workmanship cover and do not remove any FH obligations imposed by law.
厂家保修期限及条件取决于实际供应的产品、型号及保修文件。厂家保修与FH施工保修分开,不免除法律规定的FH责任。
Statutory warranties and consumer guarantees / 法定保修及消费者保障
According to the applicable law and claim / 按适用法律及具体索赔判断
These rights are separate from FH voluntary promises. Where NSW residential statutory warranties apply, the periods are generally six years for major defects and two years for other breaches. The actual work, defect and statutory tests determine applicability. Australian Consumer Law guarantees do not have one universal fixed warranty period.
这些权利与FH自愿承诺分开。适用新州住宅法定保修时,期限通常为重大缺陷六年、其它违约两年;须依据实际工作、缺陷及法定条件判断是否适用。澳大利亚消费者法保障没有一概适用的固定保修年限。
Commercial customers商业客户条款
商业客户条款 1
适用范围:商业客户;住宅性质工程仍适用住宅保护
The customer identifies the contracting entity, ABN, authorised representative and each work site. A business customer commissioning residential work must still receive any applicable residential statutory protections.
填写签约企业、ABN、授权人和各现场;企业委托住宅工程仍享有适用住宅法定保障。
商业客户条款 2
适用范围:商业客户;住宅性质工程仍适用住宅保护
Before scheduling, agree site access, induction, permits, shutdown windows and responsibilities for network approvals. Delays or repeat attendance outside the agreed scope require prior written approval of any additional charge.
预约前确认进场、现场培训、许可、停电时段及电网审批责任;额外上门或延期收费须先书面批准。
商业客户条款 3
适用范围:商业客户;住宅性质工程仍适用住宅保护
For genuine commercial work, agree the deposit and procurement / progress milestones in writing; the residential deposit policy is not the commercial schedule; deposits and verified payments are credited once. For expressly commercial ASP2 or commercial multi-site work, FH's minimum 30% policy applies where lawful. A signed agreement does not override a statutory deposit cap, cooling-off restriction or insurance prerequisite. Residential work retains all applicable protections.
经接受的报价须列明双方书面同意的订金比例或金额及阶段付款;订金和已核实付款仅抵扣一次。对于明确的商业ASP2或商业多地址工程,在法律允许时适用FH最低30%的订金政策。双方签字不能排除法定订金上限、冷静期限制或保险前提要求。住宅性质工程仍享有全部适用保护。
商业客户条款 4
适用范围:商业客户;住宅性质工程仍适用住宅保护
Variations, additional addresses and extra attendances require written scope and price approval by an authorised representative before proceeding, except immediate measures reasonably necessary to make an unsafe situation safe.
变更、新地址及额外上门先由授权人书面批准范围和价格,紧急安全处置除外。
商业客户条款 5
适用范围:商业客户;住宅性质工程仍适用住宅保护
After completion and reconciliation, the final balance is due within three NSW business days of receipt of the final invoice, unless a different lawful milestone is agreed. Statutory payment and dispute rights remain available; disputed charges may be referred for resolution.
完工核对后开尾款发票,收到后三个 NSW 工作日内付款,另有合法约定除外;保留法定付款及争议权。
商业客户条款 6
适用范围:商业客户;住宅性质工程仍适用住宅保护
FH's voluntary workmanship cover runs from completion: 12 months for ordinary electrical work (standalone switchboard upgrades, minor repairs, small additions, sockets and lights), and five years for solar/battery installation. Manufacturer warranties and applicable statutory/ACL rights are additional. An upgrade does not warrant the whole existing installation or unrelated ageing and faults in existing wiring/appliances outside the agreed work. FH remains responsible for defective work, required safety checks and damage it causes. Report discovered hazards; approve additional repair scope and price, except necessary immediate safety measures. Voluntary expiry does not end all legal responsibility.
FH对日常电工小工程(包括独立电箱升级、小范围维修、小范围加装及插座或灯具安装),自完工日起提供12个月自愿施工保修;太阳能及电池安装施工的自愿保修为五年。这些承诺针对由FH施工造成的缺陷,与产品厂家保修分开。适用的法定保修及澳大利亚消费者法权利属于额外保障,须按实际工作、缺陷及法律判断。自愿保修期限不代表所有法律责任的截止期限。 电箱升级不代表对整套原有电气系统提供保修。约定施工范围以外的原有线路及电器,与FH工作无关的老化或故障不在FH自愿保修范围;FH仍对自身施工缺陷及造成的损坏负责。施工中发现的原有安全隐患应告知客户;额外维修须批准范围及价格,必要的即时安全措施除外。
商业客户条款 7
适用范围:商业客户;住宅性质工程仍适用住宅保护
Contact support@aspl2.com.au or 1300 026 666 with the document number, site and fault details. Arrange safe access and an agreed shutdown if needed. Valid warranty or consumer guarantee claims do not attract assessment or call-out charges; unrelated maintenance or damage repairs require prior price approval.
联系 support@aspl2.com.au 或 1300 026 666,提供单号、现场及故障,安排安全进场及停电。有效索赔不收评估或上门费,其它维修先获价格批准。
商业客户条款 8
适用范围:商业客户;住宅性质工程仍适用住宅保护
Follow supplied maintenance instructions. FH voluntary workmanship cover excludes damage proven to arise from misuse, unauthorised alterations, war, extreme weather or other external events rather than defective FH work. Repeated RCBO resetting after an unresolved downstream fault may cause excluded damage; a trip alone proves neither misuse nor FH fault. Assess causation. These exclusions do not remove FH liability for defective work, statutory warranties, consumer guarantees or manufacturer obligations.
设备须按随附说明维护。对于被证实由误用、未经授权改动、战争、极端天气或其它FH无法控制的外部事件造成,而非FH施工缺陷造成的损坏,FH自愿施工保修可在该因果范围内排除。例如,RCBO因未排除的下游故障跳闸后,反复合闸被证实造成的损坏,可被排除。仅发生跳闸不能证明人为误用,FH须评估故障原因。本条款不排除FH对缺陷施工的责任、适用法定保修、消费者保障或厂家义务。
商业取消与设备采购
适用范围:商业客户;保留适用法定及NETCC权利
Customer-requested quotations do not themselves create unsolicited-sale cooling-off rights. Order equipment only after acceptance and when legally permitted. For cancellation without an applicable free-cancellation, refund or termination right, charges are limited to reasonable itemised contract costs actually incurred, including authorised non-returnable equipment, less refunds, recoveries and avoided costs. No blanket deposit forfeiture applies. Statutory refund rights prevail.
客户主动申请报价本身不会产生非邀约销售的冷静期权利。在接受报价、依法付款并满足适用等待期要求后,FH可按约定工期采购设备。客户之后取消,且不享有适用的免费取消、退款或终止权利时,收费仅限可逐项列明、与合同有关且实际发生的合理成本,包括经授权采购且无法退还的设备,并须扣除退款、转售收回款及避免发生的成本。不一概没收订金,也不自动收取全部设备款。法定退款权利优先。
一周内加急工程
适用范围:客户要求接受报价后七个自然日内开工或完工;不自动豁免法定权利
Expedited work: where the customer requests commencement or completion within seven calendar days of acceptance, record the requested dates and procurement authority. Urgency does not waive deposit caps or cooling-off rights. FH checks lawful payment, commencement and any legally effective cooling-off modification before proceeding. For lawful cancellation, apply the relevant statutory settlement rules first; otherwise apply clause 9. After compliant completion, a mere change of mind does not itself cancel the agreed payment obligation. Defect remedies and consumer rights remain.
加急工程:客户要求接受报价后七个自然日内开工或完工的,须记录要求日期及采购授权。加急不免除订金上限或冷静期权利。FH须先核实付款、开工及任何依法有效的冷静期调整条件。依法取消时,优先按相关法定结算规则处理;其它取消按第9条。合规完工后,单纯改变主意本身不取消约定付款义务。缺陷救济及消费者保障仍保留。
Residential customers住宅客户条款
住宅客户条款 1
适用范围:住宅客户
The customer confirms authority to approve work at the residential property. FH will confirm the agreed scope, access, appointments and any planned supply interruption before work.
客户确认有权批准住宅工程;开工前确认范围、进场、预约和停电安排。
住宅客户条款 2
适用范围:住宅客户
Only the itemised work is included. Unforeseen defects or additional services require written scope and price approval before proceeding, except immediate measures reasonably necessary to make an unsafe situation safe.
只包含列明项目;额外工作先书面确认范围和价格,紧急安全处置除外。
住宅客户条款 3
适用范围:住宅客户
The stated deposit is credited once against the total. Where NSW residential building law applies, the deposit must not exceed 10%; required insurance and certificates, contract information and applicable cooling-off rights must be provided before payment or work as required by law. For large projects, a separately agreed later procurement or progress payment is payable only for a completed specified stage or eligible costs already incurred with supporting supplier invoices, receipts or other evidence; it is not another advance deposit and must not duplicate an earlier payment.
订金只抵扣一次。适用 NSW 住宅建筑法规时订金最多10%,并遵守保险、合同资料和冷静期要求。大金额项目可书面约定后续采购/进度款,但须对应已完成的具体阶段或有供应商发票、收据等支持的已实际发生成本;不得作为另一笔预付订金或重复收费。
住宅客户条款 4
适用范围:住宅客户
The final invoice follows completion, approved variations and verified payments. The balance is due within three NSW business days of receipt, subject to any stronger statutory or agreed entitlement. A disputed amount does not remove the right to dispute it or seek a remedy.
完工核对变更及已付款后开尾款发票,收到后三个 NSW 工作日内支付;法定及约定的更强权利优先,保留争议权。
住宅客户条款 5
适用范围:住宅客户
The project-specific workmanship and supplier warranty periods shown in the standard terms apply. Manufacturer warranties are additional and do not replace FH's obligations. Where applicable, NSW statutory warranties generally cover major defects for six years and other defects for two years from completion.
沿用项目标准条款中的施工及供应商保修期。厂家保修不替代 FH 责任;适用时重大缺陷法定保修通常六年,其它缺陷两年。
住宅客户条款 6
适用范围:住宅客户
Report a fault to support@aspl2.com.au or 1300 026 666 with the document number, address and description. FH will arrange reasonable assessment and an applicable repair, replacement, refund or other remedy. No assessment or call-out charge will be imposed for a valid warranty or consumer guarantee claim; any charge for unrelated work requires prior approval.
联系 support@aspl2.com.au 或 1300 026 666,提供单号、地址及故障说明。有效保修或消费者保障索赔不收评估或上门费;其它收费先获同意。
住宅客户条款 7
适用范围:住宅客户
Voluntary warranty exclusions apply only to faults caused by misuse, unauthorised alteration or external damage, and do not restrict mandatory rights. Australian Consumer Law rights, applicable cancellation rights and access to NSW dispute resolution remain available.
自愿保修排除只限因误用、未经授权改动或外部损坏导致的故障;不限制法定保障、取消或争议解决权。
Quotation and payment terms通用报价与付款条款
接受报价及优先顺序
适用范围:商业及住宅,按工程适用条件
By signing this quotation, you accept its project-specific scope, prices, exclusions and terms. Mandatory law prevails; these agreed project terms take precedence over inconsistent general website terms.
签署本报价即表示您接受该工程的具体范围、价格、排除事项及条款。强制性法律规定优先;已约定的具体工程条款,优先于与其不一致的一般网站条款。
一般电工工程范围
适用范围:商业及住宅,按工程适用条件
This quotation covers the itemised electrical work, testing and commissioning. Materials and cable lengths are included only where expressly itemised.
本报价包含明细列出的电气工程、测试和调试。材料及电缆长度仅在明确列入明细时包含。
订金与尾款
适用范围:有订金的报价;金额与比例按具体单据生成
A deposit of [deposit amount] ([deposit percentage]% of the payable total) is credited against the final bill and is payable only under a separate deposit invoice, after signed acceptance, applicable cooling-off restrictions and required insurance. The final invoice is issued only after work completion and reconciliation of approved variations and verified payments. Payment is due on the date shown on the invoice, normally three NSW business days after completion and issue. If you receive it later, FH will allow at least three NSW business days from receipt and correct the due date. A stronger statutory or agreed payment entitlement prevails. Business days exclude weekends and NSW statewide public holidays; a relevant local public holiday also extends the date.
订金[订金金额](应付总额的[订金比例]%)抵扣最终账款。须在签字接受、遵守适用冷静期限制及提供所需保险后,凭单独订金发票支付。仅在完工并核对已批准的变更及已核实付款后,开具最终发票。付款按发票所列日期到期,通常为完工与开票后的三个新州工作日;如客户收到更晚,FH 应给予收件后至少三个新州工作日并更正到期日。更有利的法定或约定付款权利优先。工作日不包括周末及新州全州公共假日,适用地方公共假日亦会顺延到期日。
施工方法与变更
适用范围:商业及住宅,按工程适用条件
The installation method may change where actual site conditions require it. Changes to scope, materials or price require a revised written quotation and customer approval before extra work proceeds.
现场实际条件需要时,安装方法可能调整。范围、材料或价格的变化,须在进行额外工作前提供修订的书面报价,并取得客户批准。
GST 与现金付款
适用范围:商业及住宅,按工程适用条件
The quoted price includes GST. GST remains payable regardless of payment method; cash payment is not accepted.
报价包含GST。无论采用何种付款方式均须缴纳GST;不接受现金付款。
排除事项
适用范围:商业及住宅,按工程适用条件
Exclusions and site-specific conditions are listed on this quotation. Hidden defects, network provider charges, permits and work outside the agreed scope require a separate quotation unless expressly included.
本报价列明排除事项及现场特殊条件。隐藏缺陷、电网公司收费、许可及约定范围之外的工作,除非明确包含,否则须另行报价。
一般电工施工保修
适用范围:非太阳能/电池的一般电工工程
FH provides a voluntary 12 months warranty against defects in its other electrical installation workmanship from completion. Damage caused by misuse, interference, accidents or events beyond FH's control (including storms, fire or flooding) is not covered by this voluntary workmanship warranty. Product warranties are provided by the original manufacturer. This warranty is in addition to, and does not limit, rights under Australian Consumer Law. To make a claim, contact Steven@aspl2.com.au or 1300 026 666 with the document number and details of the issue.
FH 自完工日起,对其它电气安装施工缺陷提供12个月的自愿保修。因误用、干预、事故或FH无法控制的事件(包括风暴、火灾或洪水)造成的损坏,不属于此自愿施工保修范围。产品保修由原厂家提供。此保修是澳大利亚消费者法权利之外的额外保障,不限制该等权利。提出索赔请联系 Steven@aspl2.com.au 或1300 026 666,并提供单据号码及问题详情。
客户签字确认
适用范围:商业及住宅,按工程适用条件
The customer accepts the work scope, total price, deposit and these terms by checking acceptance and signing the quotation. Both parties receive the same document number on the final invoice.
客户通过勾选接受并签署报价,同意工作范围、总价、订金及这些条款。双方收到的最终发票使用相同的单据号码。
法定保障
适用范围:商业及住宅,按工程适用条件
Statutory protections: No term excludes Australian Consumer Law guarantees or NSW statutory warranties. Where residential building law applies, statutory warranties generally apply for six years for major defects and two years for other defects; the voluntary workmanship period does not replace or shorten these rights. Applicable deposit limits, required written contracts, the Consumer Building Guide and HBC cover remain mandatory.
法定保护:任何条款均不排除澳大利亚消费者法保障或新州法定保修。适用住宅建筑法律时,重大缺陷通常有六年法定保修,其它缺陷为两年;自愿施工保修期不能替代或缩短这些权利。适用订金限制、必需书面合同、Consumer Building Guide及HBC保险要求仍须遵守。
无订金版本
适用范围:明确不收订金的报价;替代 Q-03
No advance deposit is required. The final invoice is issued only after work completion and reconciliation of approved variations and verified payments. Payment is due on the date shown on the invoice, normally three NSW business days after completion and issue. If you receive it later, FH will allow at least three NSW business days from receipt and correct the due date. A stronger statutory or agreed payment entitlement prevails. Business days exclude weekends and NSW statewide public holidays; a relevant local public holiday also extends the date.
无需预付订金。仅在完工并核对已批准的变更及已核实付款后,开具最终发票。付款按发票所列日期到期,通常为完工与开票后的三个新州工作日;如客户收到更晚,FH 应给予收件后至少三个新州工作日并更正到期日。更有利的法定或约定付款权利优先。工作日不包括周末及新州全州公共假日,适用地方公共假日亦会顺延到期日。
商业 ASP2/多地址订金
适用范围:仅明确商业 ASP2/商业多地址;替代 Q-05
The quoted price includes GST. For this expressly commercial electrical contract, an agreed deposit of at least 30% is required after signed acceptance and a separate deposit invoice. Any statutory restriction prevails; residential work must not be classified as commercial to bypass a deposit limit.
报价包含GST。对于该项明确属于商业性质的电气合同,双方约定的订金至少为30%,并须在签字接受及另行开具订金发票后支付。所有法定限制优先;不得把住宅工程归类为商业工程,以绕过订金上限。
固定首条排除说明
适用范围:所有报价排除事项的第一条
Unforeseen work and services are excluded from this quotation.
本报价不包含不可预见的工作及服务。
客户签字声明
适用范围:报价签字页
I have reviewed the system proposal, work scope, exclusions, quoted total and terms on the preceding pages. I accept this quotation and authorise FH to proceed in accordance with those agreed terms. Any deposit is paid only against the deposit invoice issued after FH receives my signed acceptance, subject to applicable cooling-off rights and required insurance.
本人已阅读前述页面中的系统方案、工程范围、排除事项、报价总额及条款。本人接受本报价,并授权FH按已约定条款执行。任何订金仅凭FH收到本人签字接受后开具的订金发票支付,并须遵守适用冷静期权利及所需保险要求。
订金发票付款说明
适用范围:签字后另行开具的订金发票;与报价付款流程相关
The deposit invoice is issued after signed acceptance. Its stated date is an administrative payment reminder, not permission to pay during a statutory cooling-off period or before required HBC cover and the certificate have been provided. Where payment is legally permitted, pay by the stated date before scheduling work. If a statutory restriction lasts beyond that date, payment is deferred and FH must confirm a lawful revised due date without an overdue penalty for that protected period. An invoice is not proof of payment.
签字接受后开具订金发票。列明日期只是行政付款提醒,不代表允许在法定冷静期内、或必需的HBC保险及证书尚未提供前付款。依法可以付款时,应在列明日期前及安排施工前支付。如果法定限制持续超过该日期,付款须顺延,FH须确认合法的新到期日,不得就该受保护期间收取逾期罚款。发票不是付款证明。
公开条款版本引用
适用范围:当前报价v1.3;历史单据保留v1.0、v1.1或v1.2
Public service terms (v1.3): https://www.fhasp2.com.au/service-terms/v1-3 . The agreed quotation terms apply; existing contracts are not changed retrospectively.
公开服务条款(v1.3):https://www.fhasp2.com.au/service-terms/v1-3 。适用双方约定的报价条款;现有合同不会被追溯更改。
报价接受截止时间
适用范围:截止时间按具体单据生成;普通报价一般14天,太阳能至少10个新州工作日且不少于14天
Quotation acceptance deadline: [deadline, Sydney time]. This quotation cannot be accepted after expiry; please request a new quotation.
报价接受截止时间:[悉尼时间的具体截止时间]。到期后无法接受该报价,请申请新的报价。
业主(甲方)与承包商(乙方)
适用范围:所有新住宅与商业报价、安装、ASP2、电工、太阳能、电池及充电桩项目
Contracting parties: The Owner identified as a contracting party in the quotation is Party A. The Contractor named in the quotation is Party B. An authorised representative may sign on behalf of Party A but is not deemed to be the Owner. If the contracting client is a tenant, builder or another entity rather than the Owner, the quotation must identify that capacity and any required owner authority; this clause does not bind a property owner who is not a party to the contract.
合同双方:报价中明确列为合同一方的业主(所有者)为甲方,报价中列明的承包商为乙方。经授权的代表可代甲方签署,但不因代签而被认定为业主。如签约客户是租户、建筑商或其它主体而非业主,报价须明确其身份及所需业主授权;本条不使未作为合同一方的物业所有者承担合同义务。
市场成本上涨引起的价格调整
适用范围:所有新住宅与商业报价、安装、ASP2、电工、太阳能、电池及充电桩项目
Market cost increases: If market fluctuations result in increased costs of materials, labour or equipment during a prolonged period between quotation and completion of the works, the Contractor (Party B) may propose a corresponding price adjustment to the Owner (Party A). Any proposed adjustment must be notified to Party A in writing, together with the reasons for and amount of the adjustment, and agreed by both parties in writing before it takes effect. Any required variation must be signed by both parties. No price increase is applied automatically. Mandatory statutory cancellation, termination and refund rights remain unaffected.
市场成本上涨:如从报价至工程完成期间周期较长,市场波动导致材料、人工或设备成本上涨,承包商(乙方)可向业主(甲方)提出相应价格调整。调整前须书面通知甲方,说明调整原因及金额,并经双方书面同意后生效;依法或依约需签署的变更须由双方签署。不自动加价。不可排除的法定权利的取消、终止和退款权利不受影响。
特别提醒:ASP2 客户义务与资料要求
适用范围:适用ASP2项目,沿用2026年10月15日起原有要求
Special reminder — ASP2 customer obligations: 1. Provide a complete electricity bill (all pages). If no bill is available, provide the account-opening authorisation/reference number, the electricity retailer used to open the account, and the NMI number. 2. Provide the electricity account holder’s full name, contact telephone number and email address. 3. For AGL customers, also provide the account holder’s driver licence number and the name under which the account was opened. 4. For company customers, provide the full company name, a complete electricity bill, and the contact person’s telephone number and email address.
特别提醒:ASP2 客户义务与资料要求:1. 请提供完整电费单(所有页面)。如没有电费单,请提供开户许可号码、开户的能源公司名称,以及 NMI 号码。 2. 请提供电费账单所有人/开户人的完整姓名、联系电话和 Email 地址。 3. AGL 客户还须提供账单所有人/开户人的驾照号码及开户人姓名。 4. 公司客户须提供完整公司名称、完整电费单,以及联系人的电话和 Email 地址。
保密约定
适用范围:2026年10月18日新增保密条款后创建的新报价;保留专业顾问、必要参与人员及法定披露权利
Confidentiality: By signing acceptance of this quotation, Party A agrees to keep its non-public design drawings, technical proposals and commercial information confidential. Without Party B's written consent, that information must not be publicly disclosed, forwarded without authorisation or used for purposes outside this project. Private access links and verification codes must not be shared. This agreement does not prevent reasonable disclosure to professional advisers and necessary project participants who are subject to confidentiality obligations, or disclosure required by law, complaints or the exercise of statutory rights.
保密约定:甲方签署接受本报价时,即同意对其中非公开的设计图纸、技术方案及商业资料承担保密义务。未经乙方书面同意,不得对外公开、擅自转发或用于本项目以外的用途。私人访问链接及验证码不得共享。本约定不限制向负有保密义务的专业顾问及项目必要参与人员合理披露,也不限制依法披露、投诉或行使法定权利。
Solar and battery conditions太阳能与电池专项条款
太阳能与电池工程范围
适用范围:太阳能/电池报价;按该条适用条件
This quotation covers the stated solar and battery system design, supply, installation, testing and commissioning. Ordinary AC electrical materials up to 5 metres are included unless otherwise specified.
本报价包含列明的太阳能及电池系统设计、供应、安装、测试及调试。除非另有说明,包含普通交流电气材料及最多5米布线。
安装位置与施工变更
适用范围:太阳能/电池报价;按该条适用条件
The final installation location and method may change where actual roof or site conditions require it. Changes to scope, materials or price require a revised written quotation and customer approval before the extra work proceeds.
实际屋顶或现场条件需要时,最终安装位置及方法可能调整。范围、材料或价格的变化,须在额外工作开始前提供修订的书面报价并取得客户批准。
GST 与 STC 抵扣
适用范围:太阳能/电池报价;按该条适用条件
The gross price includes GST. Any expressly shown STC assignment deduction is applied once after GST to determine the payable total. Eligibility and assignment must be verified; any resulting price change requires written customer approval before proceeding. Cash payment is not accepted.
总价包含GST。明确列出的STC转让抵扣,在计算GST后仅扣除一次,以确定应付总额。补贴资格及转让须核实;由此产生的价格变更,须在执行前取得客户书面批准。不接受现金付款。
太阳能施工保修
适用范围:太阳能/电池报价;按该条适用条件
FH provides a voluntary 5 years warranty against defects in its solar and battery system installation workmanship from completion. Damage caused by misuse, interference, accidents or events beyond FH's control (including storms, fire or flooding) is not covered by this voluntary workmanship warranty. Product warranties are provided by the original manufacturer. This warranty is in addition to, and does not limit, rights under Australian Consumer Law. To make a claim, contact Steven@aspl2.com.au or 1300 026 666 with the document number and details of the issue.
FH 自完工日起,对太阳能及电池系统安装施工缺陷提供五年的自愿保修。因误用、干预、事故或FH无法控制的事件(包括风暴、火灾或洪水)造成的损坏,不属于此自愿施工保修范围。产品保修由原厂家提供。此保修是澳大利亚消费者法权利之外的额外保障,不限制该等权利。提出索赔请联系 Steven@aspl2.com.au 或1300 026 666,并提供单据号码及问题详情。
非邀约销售冷静期
适用范围:太阳能/电池报价;按该条适用条件
Unsolicited consumer agreement: If this sale is an unsolicited consumer agreement under Australian Consumer Law, you may cancel without penalty during the statutory 10-business-day cooling-off period. For an in-person sale it starts on the first business day after the agreement; for a telephone sale it starts on the first business day after you receive the agreement. Cancellation may be notified orally or in writing to FH on 1300 026 666 or Steven@fhasp2.com.au. No deposit or other payment will be accepted, and no installation will start, during this period. These rights cannot be waived.
非邀约消费者协议:仅当本交易依法属于澳大利亚消费者法规定的非邀约消费者协议时,您可在法定十个工作日冷静期内无罚金取消。面对面销售自协议达成后的首个工作日起算;电话销售自您收到协议文件后的首个工作日起算。可口头或书面通知FH取消,电话1300 026 666,邮箱Steven@fhasp2.com.au。该期间不收取订金或其它款项,也不开始安装。这类权利不可放弃。
住宅大型合同保护
适用范围:太阳能/电池报价;按该条适用条件
NSW residential building contracts: Where the statutory large-contract rules apply, you have five clear business days to cool off after receiving a copy of the signed contract, subject to the law. This is separate from the unsolicited-sale right. FH will provide the required Consumer Building Guide and, where required, Home Building Compensation cover before requesting payment or starting work. Rebates do not reduce the work value for determining the insurance threshold. Statutory termination rights remain available.
新州住宅建筑合同:适用法定大型合同规则时,在收到已签合同副本后,您依法享有五个完整工作日的冷静期;这与非邀约销售权利分别适用。FH将在请求付款或开工前提供必需的Consumer Building Guide,以及需要时的Home Building Compensation保险。计算保险门槛时,补贴不得降低工程价值。法定终止权利继续保留。
NETCC 设计与退款
适用范围:太阳能/电池报价;按该条适用条件
NETCC design and refund protection: If the site-specific design and performance estimate are first supplied after contracting, you may reject them within 10 business days of receiving both and receive a full refund. You may also terminate with a full refund if you reject a significant design change, if unforeseen extra work is needed and FH will not bear its cost, or if FH misses the agreed supply or installation timeframe (except delays caused by circumstances expressly identified in the contract as outside our control).
NETCC设计与退款保障:如果签约后才首次提供针对该现场的设计与性能估算,您可在收到两项资料后的10个工作日内拒绝,并获得全额退款。拒绝重大设计变更、出现不可预见的额外工作且FH不承担其费用,或FH未能遵守约定供应或安装时间时,您亦可终止并获全额退款;合同明确列为非FH所能控制的情况导致延误除外。
其它取消
适用范围:太阳能/电池报价;按该条适用条件
Other cancellations: There is no blanket forfeiture of the deposit. Outside an applicable cooling-off period or full-refund entitlement, any cancellation charge is limited to reasonable costs actually incurred by FH in connection with this contract; FH will itemise those costs and refund the remaining payment. No fixed cancellation percentage applies. Any stronger statutory rights prevail.
其它取消:不一概没收订金。在适用冷静期或全额退款权利之外,取消收费只限FH就该合同实际发生的合理成本;FH应列明该等成本并退还剩余款项。不适用固定取消百分比。更有利的法定权利优先。
双方签字及收据
适用范围:太阳能/电池报价;按该条适用条件
Both FH and the customer must sign the agreement and any written variations, including by an equivalent electronic acceptance method. FH will provide a receipt for every payment received.
FH与客户双方均须签署协议及所有书面变更,亦可使用等效电子接受方式。FH会就每笔收到的款项提供收据。
供应商系统保修
适用范围:太阳能/电池报价;按该条适用条件
FH provides a five-year supplier warranty from completion covering the operation and performance of the agreed solar and battery system, including equipment and installation workmanship, in addition to manufacturer warranties and statutory rights. Performance is assessed against the agreed specifications and operating conditions, not a guaranteed electricity bill or fixed daily yield. Contact support@aspl2.com.au or 1300 026 666 for assessment and appropriate repair, replacement or other applicable remedy.
FH 自完工日起,对约定的太阳能及电池系统的运行和性能提供五年供应商保修,涵盖设备及安装施工,并作为厂家保修和法定权利之外的额外保障。性能按约定规格及运行条件评估,不保证固定电费或每日固定发电量。请联系support@aspl2.com.au或1300 026 666,安排评估以及适当的维修、更换或其它适用补救。
NETCC 资料及权利
适用范围:太阳能/电池报价;按该条适用条件
FH undertakes to comply with the applicable New Energy Tech Consumer Code. The stated system estimate is a planning estimate; a site-specific installation design and performance estimate, applicable connection approvals and required consumer information must be provided under the Code. Any material change requires customer approval; applicable rejection, termination and refund rights remain available.
FH承诺遵守适用的New Energy Tech Consumer Code。所列系统估算属于规划估算;须按该准则提供现场专用安装设计、性能估算、适用并网审批及所需消费者资料。所有重大变更须经客户批准;适用的拒绝、终止及退款权利继续保留。
并网审批责任
适用范围:太阳能/电池报价;按该条适用条件
Network approval: Responsibility and any price for arranging network approval or meter reconfiguration must be identified in the agreed scope. Network or metering charges are excluded only where expressly stated. If you undertake approval and your application is rejected, applicable NETCC termination rights include a refund less reasonable expenses incurred.
电网审批:安排电网审批或电表重新配置的责任及所有价格,须在约定范围内说明。电网或计量收费只有明确说明时才排除。如果由客户办理审批而申请被拒,适用的NETCC终止权利包括退款,但可扣除实际发生的合理费用。
投诉处理
适用范围:太阳能/电池报价;按该条适用条件
Complaints: Contact Steven@aspl2.com.au or 1300 026 666. FH will acknowledge your complaint promptly, aim to respond within 15 business days and provide a final response within 25 business days unless a further extension is agreed. NETCC dispute resolution and statutory tribunal or court remedies remain available.
投诉:请联系Steven@aspl2.com.au或1300 026 666。FH将及时确认收到投诉,目标为15个工作日内回应,并在25个工作日内提供最终回复,除非双方同意进一步延期。NETCC争议解决及法定仲裁庭或法院救济继续保留。
取消通知范例
适用范围:太阳能/电池报价;按该条适用条件
Cancellation notice for an unsolicited agreement: To FH Electrician Service Pty Ltd, Steven@aspl2.com.au or 1300 026 666. I cancel quotation [number]. Customer [name], address [address], date [date]. You may instead cancel orally or by another permitted method; this form is optional.
非邀约合同取消通知:致FH Electrician Service Pty Ltd,Steven@aspl2.com.au或1300 026 666。本人取消报价[号码]。客户[姓名]、地址[地址]、日期[日期]。您亦可以口头或其它获准方式取消;本表格仅供自愿使用。
冷静期与取消提示
适用范围:太阳能报价醒目权利提示
COOLING-OFF AND CANCELLATION RIGHTS: An unsolicited sale (for example an uninvited sales visit or call) has a 10-business-day cooling-off period without penalty. Where NSW residential-building law applies to a contract over $20,000, a separate five-clear-business-day cooling-off right applies after receipt of the signed contract. NETCC design and termination refund rights are explained in the terms below. Contact FH: 1300 026 666 or Steven@fhasp2.com.au.
冷静期与取消权利:非邀约销售(例如未经邀请的销售上门或来电)适用10个工作日、无罚则的冷静期。适用新州住宅建筑法律且合同超过20,000澳元时,在收到已签合同后另有五个完整工作日的冷静期。NETCC设计及终止退款权利在以下条款中说明。联系FH:1300 026 666或Steven@fhasp2.com.au。
太阳能/电池商业及住宅条款组合
适用范围:太阳能或电池报价;叠加对应客户类型条款,法定要求按条件适用
Solar and battery terms apply to the agreed solar or battery work for residential and commercial customers, alongside the matching customer terms. Commercial classification does not itself exclude applicable consumer rights. Unsolicited-sales and NSW residential-contract requirements apply only when their legal conditions are met; a customer-initiated purchase does not itself create unsolicited-sales cooling-off rights. The stated supplier system and workmanship warranties remain as agreed.
太阳能及电池专项条款适用于约定的住宅或商业太阳能/电池工作,并与对应客户类型条款一起适用。商业分类本身不排除适用消费者权利。非邀约销售和NSW住宅合同要求,分别在其法定条件满足时适用;客户主动购买本身不产生非邀约销售冷静期。已约定的供应方系统保修及施工保修承诺仍保留。
Optional solar exclusions太阳能可选排除事项
Only the exclusions expressly included in your quotation apply. / 仅适用具体报价明确列出的排除事项。
可选排除事项 1
适用范围:仅在该项目被明确勾选或列入报价时适用
Repairs to existing roof leaks, damaged roof materials or pre-existing waterproofing defects
现有屋顶漏水、屋顶材料损坏或既有防水缺陷的维修。
可选排除事项 2
适用范围:仅在该项目被明确勾选或列入报价时适用
Structural reinforcement or engineering reports unless separately itemised
结构加固或工程师报告,除非另行列入明细。
可选排除事项 3
适用范围:仅在该项目被明确勾选或列入报价时适用
Removal or remediation of asbestos or other hazardous materials
石棉或其它危险材料的清除及处理。
可选排除事项 4
适用范围:仅在该项目被明确勾选或列入报价时适用
Switchboard, consumer mains or service upgrades unless separately itemised
开关箱、消费者主电缆或服务线升级,除非另行列入明细。
可选排除事项 5
适用范围:仅在该项目被明确勾选或列入报价时适用
Trenching, underground cabling, excavation and surface reinstatement unless separately itemised
开沟、地下电缆施工、开挖及地面恢复,除非另行列入明细。
可选排除事项 6
适用范围:仅在该项目被明确勾选或列入报价时适用
Scaffolding, crane hire or special roof access equipment unless separately itemised
脚手架、吊车或特殊屋顶通道设备,除非另行列入明细。
可选排除事项 7
适用范围:仅在该项目被明确勾选或列入报价时适用
AC cabling and materials beyond the included 5-metre allowance unless separately itemised
超过已包含5米限额的交流布线及材料,除非另行列入明细。
可选排除事项 8
适用范围:仅在该项目被明确勾选或列入报价时适用
Meter replacement, network application, connection or distributor charges unless separately itemised
电表更换、电网申请、接入或配电网络公司收费,除非另行列入明细。
可选排除事项 9
适用范围:仅在该项目被明确勾选或列入报价时适用
Whole-home backup, backup circuits or additional switchboard circuits unless separately itemised
整屋备电、备用回路或额外开关箱回路,除非另行列入明细。
可选排除事项 10
适用范围:仅在该项目被明确勾选或列入报价时适用
Internet, router, Wi-Fi or data network upgrades
互联网、路由器、Wi-Fi或数据网络升级。
可选排除事项 11
适用范围:仅在该项目被明确勾选或列入报价时适用
EV charger and accessories unless separately itemised
电动车充电桩及配件,除非另行列入明细。
可选排除事项 12
适用范围:仅在该项目被明确勾选或列入报价时适用
Tree removal, shading remediation or roof tile replacement unless separately itemised
树木移除、遮阴处理或屋瓦更换,除非另行列入明细。
Public service terms v1.3公开服务条款 v1.3
适用时间与既有合同
适用范围:公开服务条款 v1.3;按工程及法律适用条件
This page is publicly available without login. These terms apply when provided and agreed for a new contract from the effective date. Existing signed agreements retain their agreed terms; later website changes do not retrospectively amend a contract.
本页面无需登录即可查询。自生效日起,向客户提供并经双方同意后用于新合同。既有已签合同仍适用原约定;网站后续修改不追溯更改已签合同。
合同与服务范围
适用范围:公开服务条款 v1.3;按工程及法律适用条件
The contracting business is the entity named on your quotation. Only itemised work, equipment, cable lengths and services are included. A website enquiry is not authority to start work. Quote-specific agreed terms apply, subject to mandatory law.
签约主体以报价单所列公司为准。仅包含明确列出的工作、设备、电缆长度与服务。网站询盘不代表授权开工。双方书面确认的项目条款适用,但不得排除强制性法律规定。
变更与未知工作
适用范围:公开服务条款 v1.3;按工程及法律适用条件
Unforeseen work and services are excluded unless expressly itemised. Additional work, prices and schedule changes require written customer approval before proceeding. Emergency safety work requires separate authorisation.
未明确列出的未知工作与服务不包含在报价中。新增工作、价格和工期变更须在执行前取得客户书面同意。紧急安全处理亦须另行授权。
现场、安全与工期
适用范围:公开服务条款 v1.3;按工程及法律适用条件
Please provide safe access and disclose known hazards and property restrictions. Unsafe conditions may require work to stop until resolved. Installation dates depend on agreed access, equipment availability and required third-party approvals; changes will be communicated.
请提供安全通行条件,并告知已知危险与物业限制。不安全条件可能需要暂停施工直至解决。施工日期取决于约定的现场条件、设备供应及必要的第三方审批;变更将告知客户。
电工与 ASP2 服务
适用范围:公开服务条款 v1.3;按工程及法律适用条件
Work is limited to the listed electrical installations, repairs, testing or network connection work. Service cable, consumer mains, switchboards, RCBOs and Earth System work are included only where itemised. Distributor approvals, metering charges and third-party fees are included only if expressly stated. Required approvals and certificates are handled within the agreed scope.
服务仅限列明的电气安装、维修、检测或网络接入工作。服务电缆、消费者主电缆、开关箱、RCBO 与接地系统仅在明确列出时包含。配电网络审批、计量及第三方费用仅在明确说明时包含。按约定范围处理必要审批与证明文件。
太阳能与电池服务
适用范围:公开服务条款 v1.3;按工程及法律适用条件
The proposal specifies panels, inverter, battery capacity, quantity, installation location and any backup circuits. Ordinary AC electrical materials up to 5 metres are included in a solar quotation unless otherwise stated. Roof repairs, structural reinforcement, switchboard upgrades, trenching and extra cabling are included only when itemised. Generation, savings and incentive estimates depend on site conditions, usage, tariffs and eligibility; they are estimates rather than guaranteed outcomes. Backup supply is limited to the agreed equipment and circuits. Any separately referred electrical or ASP2 work is contracted with the provider named in that separate quotation.
方案应列明光伏板、逆变器、电池容量与数量、安装位置及备用供电回路。太阳能报价包含普通交流电气材料及最多 5 米布线,另有说明的除外。屋顶维修、结构加固、配电系统升级、开沟及额外布线,仅明确列出时包含。发电量、节省金额和补贴估算取决于现场条件、用电、电价及资格,不代表保证结果。备用供电范围以约定设备及回路为准。另行转介的电工或 ASP2 工作,以独立报价列明的提供方签约。
价格、订金与尾款
适用范围:公开服务条款 v1.3;按工程及法律适用条件
Prices identify GST and the agreed deposit, payment milestones and due dates in the quotation or invoice. Deposits must comply with applicable statutory limits. A deposit is credited against the final bill. After completion, approved variations and received payments are reconciled before the final invoice is issued. Payment details are provided with the invoice.
报价或发票列明 GST、约定订金、付款节点及到期日。订金须符合适用的法定限制。已收订金抵扣最终账款。工作完成后,核对已批准的变更及已收款,再开具最终发票。付款资料随发票提供。
取消与退款
适用范围:公开服务条款 v1.3;按工程及法律适用条件
Contact us promptly if you need to cancel or reschedule. Any agreed cancellation costs must reflect the contract and applicable law. Cooling-off rights and remedies under consumer law remain available where applicable. There is no blanket no-refund rule.
需要取消或改期请及时联系我们。取消费用须符合合同及适用法律。适用的冷静期权利与消费者法律救济不受影响;不实行一概不退款的规则。
施工保修与消费者权利
适用范围:公开服务条款 v1.3;按工程及法律适用条件
Work will be performed with due care and skill. Any voluntary workmanship warranty is stated in your quotation. Manufacturer warranties are additional promises; they do not replace statutory consumer guarantees. Nothing in these terms excludes rights or remedies that cannot lawfully be excluded under Australian Consumer Law or applicable NSW law.
施工应尽合理谨慎并具备专业技能。自愿提供的施工保修以报价单列明内容为准。厂家保修属于额外承诺,不替代法定消费者保障。本条款不排除澳大利亚消费者法或适用的新州法律下不可排除的权利与救济。
咨询与争议
适用范围:公开服务条款 v1.3;按工程及法律适用条件
Contact the business below with your quote or invoice number, a description and supporting records. We will review the issue and discuss a resolution. You may also seek assistance from NSW Fair Trading or pursue available tribunal or court remedies; contacting us does not waive those rights.
请向下列签约公司提供报价或发票号码、问题说明及相关资料。我们将核查并协商解决。您亦可向 NSW Fair Trading 寻求协助,或使用适用的仲裁庭、法院救济;联系我们不代表放弃这些权利。
报价与付款规则 1
适用范围:公开服务条款 v1.3;按工程及法律适用条件
Residential deposits must not exceed 10% of the contract price. FH conservatively caps non-commercial quotation deposits at 10% of the payable amount; STC deductions do not lower any statutory HBC insurance threshold. The gross price includes GST; any stated STC assignment deduction is applied once. Verified payments are credited once against the final invoice. Solar pricing remains valid for at least 10 NSW business days; other quotations normally remain valid for 14 days.
住宅工程订金不得超过合同金额的 10%。FH 对非商业类别报价保守限制为应付金额的 10%;STC 抵扣不得降低法定 HBC 保险门槛。总价包含 GST,列明的 STC 转让抵扣仅扣一次,已核实付款仅从尾款抵扣一次。太阳能报价有效期至少为 10 个新州工作日,其它报价通常为 14 天。
报价与付款规则 2
适用范围:公开服务条款 v1.3;按工程及法律适用条件
A deposit invoice is issued after signed acceptance. Its date does not override a statutory payment restriction or missing required HBC insurance and certificate. Where payment is legally permitted, the deposit is paid before scheduling work; FH must defer the date where legal restrictions apply. The final invoice is issued after work completion and reconciliation of approved variations. Payment is due on its stated date, normally three NSW business days after completion and issue. If received later, FH will allow at least three NSW business days from receipt and correct the date. Weekends and statewide public holidays are excluded; tell FH about a relevant local public holiday so the date can be extended. An overdue invoice remains payable; expiry is not cancellation of a debt.
签字确认后开具订金发票,但发票日期不得覆盖法定禁止收款期,或所需 HBC 保险及证书尚未提供的情况。依法可收款时,在安排施工前支付订金;存在法定限制时须顺延日期。完工并核对批准变更后开具最终发票,通常在完工与开票后 3 个新州工作日到期;如客户实际收到更晚,FH 应给予收件后至少 3 个工作日并更正到期日。排除周末及全州公共假日,适用地方公共假日亦可申请顺延。发票逾期不代表债务取消。
冷静期、退款与消费者权利 1
适用范围:公开服务条款 v1.3;按工程及法律适用条件
An unsolicited consumer agreement has a statutory 10-business-day cooling-off period. During that period FH will not request or accept payment or supply the contracted goods or services. A normal customer-initiated website enquiry does not itself create this unsolicited-sale cooling-off right. Separate NSW residential large-contract cooling-off rights may apply. Where required, FH provides the Consumer Building Guide and HBC cover and certificate before requesting payment or starting work. Public liability insurance does not replace HBC cover.
非邀约销售合同适用法定 10 个工作日冷静期,其间 FH 不要求或接受付款,也不提供合同项下商品及服务。客户主动网站询盘本身不会自动产生该非邀约销售冷静期。新州大型住宅工程合同可能另有冷静期。需要时,在要求付款或开工前提供 Consumer Building Guide、HBC 保险及证书;公共责任保险不能替代 HBC。
冷静期、退款与消费者权利 2
适用范围:公开服务条款 v1.3;按工程及法律适用条件
FH undertakes to comply with the applicable NETCC for its solar and battery sales. Site-specific design and performance information, consumer information and network connection responsibilities must be provided as required. If design/performance information is first provided after contracting, applicable NETCC rejection and refund rights remain available. Significant design changes, unaccepted extra costs or failure to meet the agreed timeframe may give refund or termination rights. Cancellation charges outside protected rights are limited to reasonable contract-related costs actually incurred; no blanket deposit forfeiture applies.
FH 的太阳能及电池销售承诺遵守适用 NETCC,按要求提供现场设计、性能估算、消费者资料及并网责任说明。签约后首次提供设计及性能信息时,保留 NETCC 适用的拒绝及退款权利;重大设计变更、未接受的额外费用、未履行约定工期亦可能产生退款或终止权利。保护期之外的取消费用限于实际发生的合理合同成本,不一概没收订金。
冷静期、退款与消费者权利 3
适用范围:公开服务条款 v1.3;按工程及法律适用条件
FH provides a five-year supplier warranty from completion on the agreed solar and battery system operation and performance, including equipment and workmanship. It is assessed against agreed specifications and operating conditions, not a fixed electricity bill or daily yield. Manufacturer warranties remain additional. Voluntary workmanship and manufacturer warranties do not replace Australian Consumer Law guarantees or NSW statutory warranties. Where applicable, NSW residential statutory warranties generally run for six years for major defects and two years for other defects. FH acknowledges complaints promptly, aims to respond within 15 business days and provide a final response within 25 business days unless an extension is agreed. Customers retain access to NETCC complaints, NSW Fair Trading, NCAT and court remedies.
FH 对约定的太阳能及电池系统自完工日起提供 5 年供应商保修,包含设备、施工及按约定规格和运行条件评估的运行与性能,并非保证固定电费或每日发电量。厂家保修为额外保障。自愿施工保修及厂家保修不替代澳大利亚消费者法保障或新州法定保修。适用的新州住宅工程法定保修通常为重大缺陷 6 年,其它缺陷 2 年。FH 尽快确认投诉,目标在 15 个工作日内回应、25 个工作日内给出最终回应,双方同意延期的除外。保留 NETCC、NSW Fair Trading、NCAT 及法院救济渠道。
