Scope of Work:
1. Existing Overhead Service Disconnection
* Disconnect and remove the existing overhead service connection crossing the street to allow for the demolition and rebuilding of the property.
* Carry out all necessary Level 2 ASP disconnection works.
2. Private Power Pole Installation
* Supply and install a new private power pole to establish a suitable power supply connection for the construction site.
3. Overhead Service Reconnection
* Install and reconnect new three-phase overhead service mains from the network service pole to the new private power pole.
* Complete all associated Level 2 ASP connection works.
4. Consumer Mains Installation
* Supply and install new three-phase consumer mains cables from the private power pole to the temporary switchboard.
5. Three-Phase Meter & Temporary Switchboard Installation
* Install a new three-phase electricity meter and temporary construction switchboard.
* Install the required main switch, circuit breakers, RCBOs and associated electrical components.
* Provide a safe and reliable temporary three-phase power supply for demolition and construction activities.
6. Testing & Commissioning
* Carry out all necessary electrical testing, safety inspections and commissioning in accordance with relevant Australian Standards and network service provider requirements.
Wellington Rd East Lindfield
Project details
Scope of Work:
1. Private Power Pole Installation
* Supply and install a new private power pole to establish a suitable power supply connection for the construction site.
2. Three-Phase Overhead Service Installation
* Install new three-phase overhead service mains crossing the street from the network service pole to the new private power pole.
* Complete all associated Level 2 ASP overhead service connection works.
3. Consumer Mains Installation
* Supply and install new three-phase consumer mains cables from the private power pole to the temporary construction switchboard.
* Complete all necessary cable connections and associated wiring.
4. Three-Phase Meter & Temporary Switchboard Installation
* Arrange for the installation of a new three-phase electricity meter.
* Supply and install a new temporary construction switchboard and distribution board.
* Install the required main switches, circuit breakers, RCBOs and associated electrical components.
* Establish a safe and reliable temporary three-phase power supply for construction activities.
5. Testing & Commissioning
* Carry out all necessary electrical testing, safety inspections and commissioning in accordance with relevant Australian Standards and network service provider requirements.
McBurney Rd Cabramatta
Project details
Scope of Work:
1. Private Power Pole Installation
* Supply and install a new private power pole to establish a suitable electricity supply connection for the construction site.
* Complete all necessary pole installation and associated electrical works.
2. Overhead Service Installation
* Supply and install new overhead service mains from the network service pole to the new private power pole.
* Complete all necessary Level 2 ASP overhead service connection works.
3. Consumer Mains Installation
* Supply and install new appropriately sized consumer mains cables from the private power pole to the temporary construction switchboard.
* Complete all necessary cable connections and associated electrical wiring.
4. Temporary Construction Switchboard Installation
* Supply and install a new temporary builder’s supply switchboard and distribution board.
* Install the required main switch, circuit protection devices, RCBOs and associated electrical components.
* Establish a safe and reliable temporary electricity supply for construction activities.
5. Electrical Testing & Commissioning
* Carry out all necessary electrical safety inspections, testing and commissioning.
* Ensure the installation complies with relevant Australian Standards and electricity network requirements.
Osborne Rd Greenwich
Project details
Scope of Work:
1. Consumer Mains Replacement & Upgrade
* Engaged by the builder to carry out electrical upgrade works as part of the residential renovation project.
* Remove and replace the existing consumer mains with new appropriately sized cables to accommodate the property’s updated electrical requirements.
* Complete all necessary cable connections and associated Level 2 ASP electrical works.
2. Main Switchboard Replacement & Upgrade
* Remove the existing main switchboard and install a new compliant switchboard enclosure.
* Upgrade and reorganise the associated internal wiring, main switches, protective devices and electrical components as required.
* Ensure the upgraded switchboard is suitable for the renovated property’s electrical installation.
3. Smart Electricity Meter Installation
* Arrange for the replacement of the existing electricity meter with a new smart meter.
* Complete the necessary metering connections and associated electrical modifications in accordance with electricity network and metering provider requirements.
4. Electrical Testing & Commissioning
* Carry out all necessary electrical safety inspections, testing and commissioning.
* Ensure the upgraded electrical installation complies with applicable Australian Standards and electricity network requirements.
O‘Keefe Cr Eastwood
Project details
Scope of Work:
1. Private Power Pole Installation
* Engaged by the builder to carry out Level 2 ASP electrical connection works for the property.
* Installed a new private power pole during the early stage of construction, prior to the commencement of brickwork.
* Prepared the private power pole for the future overhead service connection and underground consumer mains.
2. Overhead Service Installation & Connection
* Returned to the site at a later stage of construction to install the new overhead service mains crossing the street.
* Connected the overhead service from the network service pole to the newly installed private power pole.
* Completed the necessary Level 2 ASP overhead service connection works.
3. Underground Consumer Mains Installation & Termination
* The underground consumer mains had been previously installed by the on-site electrician, with the cable ends brought up from underground near the base of the private power pole.
* Routed the existing consumer mains into the private power pole and pulled the cables internally up to the top of the pole.
* Secured and terminated the consumer mains at the overhead service connection point.
* Completed all necessary cable connections and associated electrical works.
4. New Electricity Meter Installation & Power Connection
* Completed the necessary metering connections at the main switchboard and arranged for the installation of a new electricity meter.
* Connected and energised the electrical installation to establish the property’s electricity supply.
5. Electrical Testing, Inspection & Compliance
* Carried out all required electrical safety inspections and testing.
* Verified the overhead service connection, consumer mains termination, metering connections and electrical installation.
* Completed the relevant compliance documentation and ensured the work met applicable Australian Standards and electricity network requirements.
Horace St St Ives
Project details
Scope of Work:
1. Level 2 ASP Works – Residential Renovation
* Engaged by the builder to carry out Level 2 ASP electrical upgrade works as part of the residential renovation project.
* Upgrade the property’s existing single-phase electricity supply to a three-phase supply.
* Convert the existing overhead service connection to a new underground electrical supply arrangement.
2. Existing Overhead Service Disconnection
* Safely disconnect and remove the existing overhead service connection.
* Complete all necessary electrical isolation and make-safe procedures before commencing the underground service upgrade.
3. Underground Service Installation – Network Service Pole to Private Pillar
* Install new three-phase underground service cables from the network service pole to the private pillar.
* Complete all necessary underground cable connections, terminations and associated Level 2 ASP works.
* Establish a new underground service connection to replace the existing overhead supply arrangement.
4. Underground Consumer Mains Installation
* Install new appropriately sized three-phase underground consumer mains from the private pillar to the Main Switchboard (MSB).
* Complete all necessary cable routing, connections and terminations.
* Configure the electrical supply to accommodate the new three-phase distribution system.
5. Main Switchboard Replacement & Distribution Board Upgrade
* Disconnect and remove the existing main switchboard and distribution panel.
* Supply and install a new three-phase main switchboard enclosure and distribution board.
* Upgrade the associated main switches, protective devices, internal wiring and electrical components.
* Reorganise and reconnect the existing electrical circuits to suit the upgraded three-phase supply.
6. New Three-Phase Smart Meter Installation
* Arrange for the installation of a new three-phase smart electricity meter.
* Complete the required metering panel upgrades, wiring modifications and connections.
* Configure the new metering arrangement to accommodate the upgraded three-phase electricity supply.
7. Electrical Connection, Testing & Compliance
* Complete the necessary electrical service connections and energisation.
* Carry out all required electrical safety inspections, testing and commissioning.
* Verify the underground service connection, consumer mains, main switchboard and three-phase metering arrangement.
* Complete the relevant electrical compliance documentation in accordance with applicable Australian Standards and electricity network requirements.
Neville St Ryde
Project details
Scope of Work:
1. Site Inspection & Electrical Service Disconnection
* Engaged by the builder to carry out Level 2 ASP electrical works at the construction site.
* The existing temporary construction switchboard and private power pole were struck by a heavy vehicle, causing the installation to lean and creating potential electrical safety hazards.
* Safely disconnected and isolated the existing electrical supply before commencing the replacement works.
2. Temporary Switchboard & Damaged Pole Removal
* Disconnect and dismantle the existing temporary construction switchboard and associated electrical components.
* Remove the damaged and leaning private power pole.
* Make the site safe for the installation of the replacement power pole.
3. New Private Power Pole Installation
* Supply and install a new private power pole to replace the damaged pole.
* Securely install the new pole to accommodate the overhead service connection and underground consumer mains.
4. Overhead Service Reinstallation
* Reinstall the overhead service mains crossing the street from the network service pole to the new private power pole.
* Complete all necessary overhead service connections and associated Level 2 ASP works.
5. Underground Consumer Mains Connection
* Connect the existing underground consumer mains to the new private power pole.
* Complete the necessary cable routing, termination and electrical connections to establish the supply to the building’s main switchboard.
6. Electricity Meter Relocation to Main Switchboard
* Relocate the electricity metering arrangement from the temporary construction supply to the permanent main switchboard mounted on the external wall of the building.
* Arrange for the installation and connection of the electricity meter within the new main switchboard.
* Complete all necessary metering connections and associated electrical modifications.
7. Electrical Service Reconnection & Power Restoration
* Reconnect and energise the electrical supply following completion of the installation works.
* Restore electricity supply to the property through the permanent main switchboard.
8. Electrical Testing, Commissioning & Compliance
* Carry out all necessary electrical safety inspections, testing and commissioning.
* Verify the overhead service connection, private power pole, underground consumer mains and metering installation.
* Complete the relevant electrical compliance documentation in accordance with applicable Australian Standards and electricity network requirements.
Neville St Ryde
Project details
Scope of Work:
1. Private Power Pole Installation
* Engaged by the builder to carry out Level 2 ASP electrical connection works for the property.
* Supply and install a new private power pole to establish a suitable electricity supply connection.
* Prepare the pole for overhead service and underground consumer mains connections.
2. Overhead Service Installation
* Supply and install new overhead service mains crossing the street from the network service pole to the new private power pole.
* Complete all necessary Level 2 ASP overhead service connection works.
3. Underground Consumer Mains Connection
* Connect the existing underground consumer mains to the new private power pole.
* Route the consumer mains through the private power pole to the overhead service connection point.
* Complete all necessary cable terminations and electrical connections.
4. Electricity Meter Installation
* Arrange for the installation of a new electricity meter at the main switchboard.
* Complete the necessary metering connections and associated electrical works.
5. Power Supply Connection & Energisation
* Complete the final electrical service connections.
* Energise the electrical installation and establish power supply to the property.
6. Electrical Testing & Compliance
* Carry out all necessary electrical safety inspections and testing.
* Verify the private power pole, overhead service, underground consumer mains and metering connections.
* Complete the required compliance documentation in accordance with applicable Australian Standards and electricity network requirements.
Toolang Rd St Ives
Project details
Scope of Work:
1. Existing Electrical Service Disconnection
* Engaged by the builder to carry out Level 2 ASP electrical works as part of a residential renovation project.
* Safely disconnect and isolate the existing electrical supply to the property before commencing construction and electrical modifications.
* Complete all necessary electrical disconnection and make-safe procedures.
2. Private Power Pole Installation
* Supply and install a new private power pole to establish a suitable electricity supply connection for the renovation site.
* Encountered extensive rock and hard ground conditions during excavation, requiring additional excavation work and preparation for the pole foundation.
* Complete the necessary groundwork and securely install the new private power pole.
3. Overhead Service Installation
* Supply and install new overhead service mains from the network service pole to the newly installed private power pole.
* Complete all necessary Level 2 ASP overhead service connections and associated electrical works.
4. Consumer Mains Installation
* Supply and install new appropriately sized consumer mains cables from the private power pole to the temporary construction switchboard.
* Complete all necessary cable routing, terminations and electrical connections.
5. Temporary Builder’s Supply Installation
* Supply and install a new temporary construction switchboard and distribution board.
* Install the required main switch, circuit protection devices, RCBOs and associated electrical components.
* Establish a suitable temporary power supply for the residential renovation works.
6. Electrical Testing, Inspection & Power Reconnection
* Carry out all necessary electrical safety inspections and testing.
* Verify the private power pole, overhead service, consumer mains and temporary switchboard installation.
* Complete the required Level 2 ASP service reconnection and energisation works.
* Restore electricity supply to the construction site in accordance with applicable Australian Standards and electricity network requirements.
Mawson St St Ives
Project details
Scope of Work:
1. Existing Electrical Service Disconnection
* Carry out Level 2 ASP electrical works as part of the residential demolition and rebuilding project.
* Safely disconnect and isolate the existing electricity supply before commencing the new underground service installation.
* Complete all necessary electrical disconnection and make-safe procedures.
2. Private Service Pillar Installation
* Supply and install a new private electrical service pillar to establish a new underground power supply connection for the property.
* Prepare and securely install the pillar in a suitable location to accommodate the underground electrical service.
3. Trenching & Underground Cable Route Preparation
* Carry out excavation and trenching works between the private service pillar and the network service pole.
* Prepare the underground cable route, including the necessary conduits and associated underground electrical infrastructure.
* Ensure the trenching and cable installation meet applicable electrical and network requirements.
4. Underground Service Cable Installation
* Install new underground electrical service cables from the private service pillar to the network service pole, replacing the previous supply arrangement.
* Complete the necessary cable routing, protection and terminations.
* Carry out the required Level 2 ASP underground service connection works.
5. Electrical Testing, Inspection & Compliance
* Carry out the necessary electrical safety inspections and testing.
* Verify the private service pillar, underground cable installation and associated electrical connections.
* Complete the relevant compliance documentation in accordance with applicable Australian Standards and electricity network requirements.
Douglas St St Ives
Project details
Scope of Work:
1. Electrical Service Disconnection
* Engaged by the builder to carry out Level 2 ASP electrical works for the construction project.
* Safely disconnect and isolate the existing electrical supply before commencing the installation and upgrade works.
2. Overhead Service Upgrade
* Upgrade the existing overhead service mains to accommodate the new three-phase electrical supply.
* Install and connect the upgraded overhead service cables.
* Complete all necessary Level 2 ASP service connection works.
3. Consumer Mains Installation
* Supply and install new appropriately sized three-phase consumer mains cables.
* Complete all necessary cable routing, terminations and electrical connections to the temporary construction switchboard.
4. Temporary Construction Switchboard & Distribution Board Installation
* Supply and install a new temporary construction switchboard and distribution board.
* Install the required main switch, circuit breakers, RCBOs and associated electrical components.
* Complete the internal wiring and circuit configuration to establish a temporary three-phase power supply for construction activities.
5. Three-Phase Smart Meter Installation
* Arrange for the installation of a new three-phase smart electricity meter.
* Complete the necessary metering connections and associated electrical modifications.
6. Earth Electrode Installation
* Supply and install a new earth electrode (earth stake).
* Complete the necessary earthing connections for the temporary electrical installation.
7. Electrical Testing, Inspection & Power Connection
* Carry out all necessary electrical safety inspections and testing.
* Verify the overhead service, consumer mains, temporary switchboard, metering connections and earthing system.
* Reconnect and energise the electrical supply following successful testing.
* Complete the required compliance documentation in accordance with applicable Australian Standards and electricity network requirements.